Pre-Construction
For an initial in showroom consultation, bring a list of questions, measurements or space specifications, and your budget information.
Before we meet, it’s advisable to confirm the date, time, and location of our meeting, review any relevant information or materials related to the meeting agenda, and prepare any questions or topics you’d like to discuss during our meeting.
The layout and space planning for your remodel project is typically done by an interior designer, architect, or a professional in the field of home design and renovation.
After The Contract Is Signed
A typical bathroom remodel takes around 2 to 3 weeks to complete, but the timeline can vary based on the project’s size and complexity.
it depends on the manufacturer, please check the product documentation, such as manuals or warranty cards, or contact the manufacturer or retailer where you bought the products for information about their warranty coverage.
The time it takes to build cabinets can vary depending on factors like the complexity of the design, the materials used, and the cabinet maker’s schedule. On average, custom cabinet construction may take several weeks.
After signing a contract, the next steps typically involve project planning and execution. This may include finalising design details, obtaining necessary permits, ordering materials, scheduling work, and setting a project timeline. Your contractor or service provider will guide you through the specific post-contract process for your project.
Miscellaneous
Toulmin Kitchen & Bath may include kitchen and bathroom fixtures, appliances, cabinets, countertops, and other related items.
The best countertops for your kitchen depend on your budget, style preferences, and lifestyle. Popular options include:
Granite: Durable, natural stone with various colours and patterns.
Quartz: Engineered stone with a wide range of colours and low maintenance.
Marble: Elegant and luxurious, but more susceptible to stains.